Egyptian Code Part1 (1011) Sanitary Drainage Pumping Stations ECP 101 – 1997
Egyptian Code Part1 1011 Sanitary Drainage Pumping Stations ECP 101 – 1997
Source: https://mhuc.gov.eg
Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Preface
Due to the successive development and steady expansion in the filed of constriction, building and reconstruction at a national scale, it was issued Law
No. 6/1964 regarding design criteria and rules of construction and building works (Article 1), where Ministry of Housing, Utilities and Urban Communities is
responsible to implement this work.
Only logged in customers who have purchased this product may leave a review.
Related products
Egyptian Code Third part 1013 Potable Water Treatment Plants ECP 101 – 1997
Introduction
Due to the huge investments in the filed of infra structural of water supply and sanitary drainage projects, as these projects represent the urgent priorities in development programs, and due to the change of urban styles in our community, so it is necessary to chose systems and methods suitable for water treatment works. As water-supplying projects are carried out according to special conditions and specifications followed by each administrative entity in cooperation with the authorities and bodies implementing these works, this has led to a multiplicity of jurisprudence in the preparation of design criteria and rules for the sanitary drainage works (pumping stations and treatment plants) due the multiplicity of agencies working in this area, which led to differences in the criteria and rules to be followed for the same type of works.
Egyptian Code Third part 1013 Potable Water Treatment Plants ECP 101 – 1997
Introduction
Due to the huge investments in the filed of infra structural of water supply and sanitary drainage projects, as these projects represent the urgent priorities in development programs, and due to the change of urban styles in our community, so it is necessary to chose systems and methods suitable for water treatment works. As water-supplying projects are carried out according to special conditions and specifications followed by each administrative entity in cooperation with the authorities and bodies implementing these works, this has led to a multiplicity of jurisprudence in the preparation of design criteria and rules for the sanitary drainage works (pumping stations and treatment plants) due the multiplicity of agencies working in this area, which led to differences in the criteria and rules to be followed for the same type of works.
Reviews
There are no reviews yet.