. Introduction
This chapter introduces the fundamental concepts of DCS systems. The terms Supervisory Control and Data Acquisition (SCADA), Distributed Control System (DCS), Programmable Logic Controller (PLC), and Smart Instrument are defined and placed in the context used in this manual. The chapter is split into the following sections:
Definitions of the terms SCADA, DCS, PLC and smart instrument
Remote terminal unit (RTU) structure
PLCs used as RTUs
System reliability and availability
Communication architectures and philosophies
Typical considerations in configuration of a master station
SCADA Systems Hardware(And FirmWare)
. Introduction
This chapter introduces the fundamental concepts of DCS systems. The terms Supervisory Control and Data Acquisition (SCADA), Distributed Control System (DCS), Programmable Logic Controller (PLC), and Smart Instrument are defined and placed in the context used in this manual. The chapter is split into the following sections:
Definitions of the terms SCADA, DCS, PLC and smart instrument
Remote terminal unit (RTU) structure
PLCs used as RTUs
System reliability and availability
Communication architectures and philosophies
Typical considerations in configuration of a master station
Installation of Optical Fibre Cables Inside Sewer Ducts
Summary
ITU-T Recommendation L.77 describes methods to install optical cables inside sewer ducts, which applies to both the cable installation and the pre-installation of an infrastructure, if requested. This Recommendation covers both man- and non-man-accessible sewer ducts. This Recommendation is not intended to address all of the safety concerns, if any, associated with its use. Therefore, it shall be the responsibility of the user of this Recommendation to establish appropriate health and safety practices and determine the applicability of regulatory limitations, if any, prior to its use.
Installation of Optical Fibre Cables Inside Sewer Ducts
Summary
ITU-T Recommendation L.77 describes methods to install optical cables inside sewer ducts, which applies to both the cable installation and the pre-installation of an infrastructure, if requested. This Recommendation covers both man- and non-man-accessible sewer ducts. This Recommendation is not intended to address all of the safety concerns, if any, associated with its use. Therefore, it shall be the responsibility of the user of this Recommendation to establish appropriate health and safety practices and determine the applicability of regulatory limitations, if any, prior to its use.
Electrical Advanced-Level Training
Introduction:
This training is recommended for inspectors performing component design bases inspections (CDBIs) or other detailed inspections of electrical systems. Inspectors with demonstrated experience may be grandfathered in the completion of this training, if approved by the division director.
Completion of technical proficiency-level training (Appendix C in IMC 1245) is strongly recommended before beginning this training. You may complete the requirements in this training standard along with the general proficiency requirements contained in Appendix B and
the technical proficiency requirements in Appendix C.
Objectives of Advanced-Level Training This training focuses on the activities necessary to fully develop individuals as lead or “experts” in the electrical inspection area. It is not the intent that all certified inspectors will complete all of the ISAs in this advanced appendix. In addition, this appendix should also be viewed as an inspector’s aid and could be used during an inspection to assist in inspecting a particular area.
Electrical Advanced-Level Training
Introduction:
This training is recommended for inspectors performing component design bases inspections (CDBIs) or other detailed inspections of electrical systems. Inspectors with demonstrated experience may be grandfathered in the completion of this training, if approved by the division director.
Completion of technical proficiency-level training (Appendix C in IMC 1245) is strongly recommended before beginning this training. You may complete the requirements in this training standard along with the general proficiency requirements contained in Appendix B and
the technical proficiency requirements in Appendix C.
Objectives of Advanced-Level Training This training focuses on the activities necessary to fully develop individuals as lead or “experts” in the electrical inspection area. It is not the intent that all certified inspectors will complete all of the ISAs in this advanced appendix. In addition, this appendix should also be viewed as an inspector’s aid and could be used during an inspection to assist in inspecting a particular area.
Reviews
There are no reviews yet.