Design And Construction Manual Linear Municipal Infrastructure Standards
Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Category:
Design Guidelines
Only logged in customers who have purchased this product may leave a review.
Related products
Design of Water Filter for Third World Countries
Abstract
The residents in third world countries battle against waterborne diseases every day. It is a luxury to have access to safe drinking water. However, it is extremely difficult to invest on a water filter with minimal annual income. A low cost water filter can serve as a subsidy such that every family can take advantage of this luxury. In this thesis, literature reviews on existing water filters have been completed and design of a dual level water filter with ceramic and activated carbon is developed. Water flow rate tests are carried out to optimize water filter design.
Further, the filter effectiveness in diminishing various contaminates is analyzed by a licensed sampling laboratory. A manufacturing line to produce the dual water filters is proposed and the cost of manufacturing a unit is calculated to be $1.53 USD, which is an affordable price for people in third world countries. With a low cost water filter available, residents in the third world countries could enjoy having safe drinking water and improve quality of life.
Design of Water Filter for Third World Countries
Abstract
The residents in third world countries battle against waterborne diseases every day. It is a luxury to have access to safe drinking water. However, it is extremely difficult to invest on a water filter with minimal annual income. A low cost water filter can serve as a subsidy such that every family can take advantage of this luxury. In this thesis, literature reviews on existing water filters have been completed and design of a dual level water filter with ceramic and activated carbon is developed. Water flow rate tests are carried out to optimize water filter design.
Further, the filter effectiveness in diminishing various contaminates is analyzed by a licensed sampling laboratory. A manufacturing line to produce the dual water filters is proposed and the cost of manufacturing a unit is calculated to be $1.53 USD, which is an affordable price for people in third world countries. With a low cost water filter available, residents in the third world countries could enjoy having safe drinking water and improve quality of life.
Chilled Water Plant Design Guide
Introduction:
Many large buildings, campuses, and other facilities have plants that make chilled water and distribute it to air handling units and other cooling equipment. The design operation and maintenance of these chilled water plants has a very large impact on building energy use and energy operating cost. Not only do chilled water plants use very significant amounts of electricity (as well as gas in some cases), they also significantly contribute to the peak load of buildings. The utility grid in California, and in many other areas of the country, experiences its maximum peak on hot summer days. During this peak event, chilled water plants are often running at maximum capacity. When temperatures are moderate, chilled water plants are shut down or operated in stand-by mode. This variation in the rate of energy use is a major contributor to the peaks and valleys in energy demand, which is one of the problems that must be addressed by utility grid managers. Most buildings and facilities that have chilled water plants have special utility rates where the cost of electricity depends on when it is used and the maximum rate of use. For instance, PG&E has five time charge periods: summer on-peak, summer mid-peak, summer off-peak, winter mid-peak and winter off-peak. The price of electricity is several times higher during the summer on-peak than it is during the off-peak periods. Not only does the cost of electricity vary, but most utility rates also have a monthly demand charge based on the maximum rate of electricity use for the billing period. Since chilled water plants operate more intensely during the summer peak period, efficiency gains and peak reductions can result in very large utility bill savings. In addition to new construction, the chilled water plants of many existing buildings are being replaced or overhauled. Older chilled water plants have equipment that uses ozone-damaging refrigerants. International treaties, in particular the Montreal Protocol, call for ozone damaging chemicals (in particular CFCs) to be phased out of production. As the availability of CFCs is reduced, the price will skyrocket, creating pressure for chilled water plants to be overhauled or replaced.
Chilled Water Plant Design Guide
Introduction:
Many large buildings, campuses, and other facilities have plants that make chilled water and distribute it to air handling units and other cooling equipment. The design operation and maintenance of these chilled water plants has a very large impact on building energy use and energy operating cost. Not only do chilled water plants use very significant amounts of electricity (as well as gas in some cases), they also significantly contribute to the peak load of buildings. The utility grid in California, and in many other areas of the country, experiences its maximum peak on hot summer days. During this peak event, chilled water plants are often running at maximum capacity. When temperatures are moderate, chilled water plants are shut down or operated in stand-by mode. This variation in the rate of energy use is a major contributor to the peaks and valleys in energy demand, which is one of the problems that must be addressed by utility grid managers. Most buildings and facilities that have chilled water plants have special utility rates where the cost of electricity depends on when it is used and the maximum rate of use. For instance, PG&E has five time charge periods: summer on-peak, summer mid-peak, summer off-peak, winter mid-peak and winter off-peak. The price of electricity is several times higher during the summer on-peak than it is during the off-peak periods. Not only does the cost of electricity vary, but most utility rates also have a monthly demand charge based on the maximum rate of electricity use for the billing period. Since chilled water plants operate more intensely during the summer peak period, efficiency gains and peak reductions can result in very large utility bill savings. In addition to new construction, the chilled water plants of many existing buildings are being replaced or overhauled. Older chilled water plants have equipment that uses ozone-damaging refrigerants. International treaties, in particular the Montreal Protocol, call for ozone damaging chemicals (in particular CFCs) to be phased out of production. As the availability of CFCs is reduced, the price will skyrocket, creating pressure for chilled water plants to be overhauled or replaced.
Design Characteristics For Evaporation Ponds In Wyoming
ABSTRACT:
Information for the design of evaporation ponds in Wyoming has been developed. The suitability of various models for estimating evaporation and its variability was investigated while the spatial and temporal variabilities of net evaporation at seven locations were described. A routing procedure was developed to analyze the effects of uncertainty in net evaporation estimates on the probability of pond failure. Comparison of equations which estimate evaporation using climatological data showed that the equations vary greatly in their ability to define the variability of evaporation. The Kohler-Nordenson-Fox equation provided monthly and annual evaporation estimates having statistics resembling those of
measured pan data closer than any of seven other equations tested. The equation requires temperature, radiation, wind, and humidity data as inputs. The Kohler-Nordenson-Fox equation using climatic data extrapolated from nearby stations provided better definition of the variability of evaporation than did equations requiring only on-site temperature data. However, results indicate that extreme care must be taken in selecting the stations from which data will be extrapolated. Monthly and annual means, standard deviations, and highest and lowest evaporation and net evaporation values have been calculated for seven Wyoming stations. The year-to-year and spatial variation of evaporation and/or net evaporation in Wyoming was shown to be great enough to cause serious problems in defining rates for evaporation pond designs. Several factors were shown to exist which might produce uncertainties in any estimate of evaporation. The routing procedure was applied to analyze the effects of these uncertainties and variations. Results indicate that the liquid depth of an evaporation pond depends greatly on evaporation rates and maintenance of minimum liquid depths without pond overflow is very difficult.
Design Characteristics For Evaporation Ponds In Wyoming
ABSTRACT:
Information for the design of evaporation ponds in Wyoming has been developed. The suitability of various models for estimating evaporation and its variability was investigated while the spatial and temporal variabilities of net evaporation at seven locations were described. A routing procedure was developed to analyze the effects of uncertainty in net evaporation estimates on the probability of pond failure. Comparison of equations which estimate evaporation using climatological data showed that the equations vary greatly in their ability to define the variability of evaporation. The Kohler-Nordenson-Fox equation provided monthly and annual evaporation estimates having statistics resembling those of
measured pan data closer than any of seven other equations tested. The equation requires temperature, radiation, wind, and humidity data as inputs. The Kohler-Nordenson-Fox equation using climatic data extrapolated from nearby stations provided better definition of the variability of evaporation than did equations requiring only on-site temperature data. However, results indicate that extreme care must be taken in selecting the stations from which data will be extrapolated. Monthly and annual means, standard deviations, and highest and lowest evaporation and net evaporation values have been calculated for seven Wyoming stations. The year-to-year and spatial variation of evaporation and/or net evaporation in Wyoming was shown to be great enough to cause serious problems in defining rates for evaporation pond designs. Several factors were shown to exist which might produce uncertainties in any estimate of evaporation. The routing procedure was applied to analyze the effects of these uncertainties and variations. Results indicate that the liquid depth of an evaporation pond depends greatly on evaporation rates and maintenance of minimum liquid depths without pond overflow is very difficult.
IMS Design Quick Start Guide
The IMSDesign Quick Start Guide contains information about how you can install the Integrated Membrane System Design (IMSDesign) application. Additionally, this guide contains detailed information about setting the options related to different modules of the application.
IMS Design Quick Start Guide
The IMSDesign Quick Start Guide contains information about how you can install the Integrated Membrane System Design (IMSDesign) application. Additionally, this guide contains detailed information about setting the options related to different modules of the application.
Design of Sanitary Sewers
Introduction:
Sewer systems are essential for the public health and welfare in all areas of concentrated population and development. Every community produces water‐borne wastes of domestic, commercial, and industrial origin. Sewers perform the virtually needed functions of collecting these wastes and conveying them to points of discharge or disposal.
Design of Sanitary Sewers
Introduction:
Sewer systems are essential for the public health and welfare in all areas of concentrated population and development. Every community produces water‐borne wastes of domestic, commercial, and industrial origin. Sewers perform the virtually needed functions of collecting these wastes and conveying them to points of discharge or disposal.
Design of Water Hammer Shock Absorber
Abstract:
In the piping system, water hammer or hydraulic shock is a major issue that engineers need to consider. Water hammer is a phenomenon that leads to shock waves in the fluid due to rapid closing and opening of the valve, which can affect pipes, valves and gauges in any water, gas, or oil applications due to the sudden transient event. It is there for every system that has a flow of fluid through pumping such as houses, hospitals, and influences major effectiveness in the power plant. It occurs when there is a pressure difference in the pipeline leading to a loud noise. Specifically, this project is aimed to design a pipeline system and develop solutions to reduce the water hammer using a shock absorber. The main idea of the design project is to design a water hammer system using a shock absorber in order to reduce the shock waves of the pipes.
Design of Water Hammer Shock Absorber
Abstract:
In the piping system, water hammer or hydraulic shock is a major issue that engineers need to consider. Water hammer is a phenomenon that leads to shock waves in the fluid due to rapid closing and opening of the valve, which can affect pipes, valves and gauges in any water, gas, or oil applications due to the sudden transient event. It is there for every system that has a flow of fluid through pumping such as houses, hospitals, and influences major effectiveness in the power plant. It occurs when there is a pressure difference in the pipeline leading to a loud noise. Specifically, this project is aimed to design a pipeline system and develop solutions to reduce the water hammer using a shock absorber. The main idea of the design project is to design a water hammer system using a shock absorber in order to reduce the shock waves of the pipes.
Reviews
There are no reviews yet.