How To Add Value To Your Estimates With Value Engineering

Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Category:
Share The Book

A Brief History 

During World War II, value engineering was first introduced in the manufacturing industry by General Electric. In the beginning, they actually called it “value analysis” because of the shortage of supplies, skilled labor, parts, and materials during the war. Interestingly enough, this time of scarcity allowed the AEC industry to apply value engineering methods to a variety of projects. This eventually grew into a highly efficient and valuable process that is still practiced today.1 A 

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

    0
    Your Cart
    Your cart is emptyReturn to Shop
    ×