Study On Requirements And Implementation Of Entsog’s Cost Benefit Analysis For Hydrogen Infrastructure For ACER

Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Category:
Share The Book

The recast TEN-E Regulation (Regulation (EU) 2022/869) requires ACER (Articles 11(2) and (3)) to provide an opinion on the draft single-sector Cost-Benefit Analysis (CBA) methodology for hydrogen infrastructure projects prepared by ENTSOG, to be taken into account by ENTSOG when amending its draft CBA methodology and submitting it to the European Commission for approval.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

    0
    Your Cart
    Your cart is emptyReturn to Shop
    ×