TPM and OEE
Source: https://www.lbspartners.ie
Edited by: Maurie O’Brie
Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Category:
Operation & Maintenance
Total Productive Maintenance (TPM) is defined as a company-wide, team-based effort to build quality into equipment and to improve productivity by reducing the time lost due to breakdowns.
Overall Equipment Effectiveness (OEE) is a one of the key measures of TPM which indicates how effectively the machinery and equipment is being run.
Only logged in customers who have purchased this product may leave a review.
Related products
Overview, Installation and Maintenance of Pumps, Valves and Piping
When you have completed this chapter, you will be able to do the following:
1. Recognize the principles of pump operation. 2. Identify the different types of pumps. 3. Identify an eductor.
4. Identify basic types and functions of valves. 5. Identify the types of steam traps. 6. Identify the different types of strainers.
7. Recognize the different types of filters. 8. Identify tubing and associated fittings. 9. Identify piping, associated fittings, and flange shielding.
10. Identify the types of packing and gasket material.
Overview, Installation and Maintenance of Pumps, Valves and Piping
When you have completed this chapter, you will be able to do the following:
1. Recognize the principles of pump operation. 2. Identify the different types of pumps. 3. Identify an eductor.
4. Identify basic types and functions of valves. 5. Identify the types of steam traps. 6. Identify the different types of strainers.
7. Recognize the different types of filters. 8. Identify tubing and associated fittings. 9. Identify piping, associated fittings, and flange shielding.
10. Identify the types of packing and gasket material.
Design Of Aerobic Granular Sludge Reactors
Introduction
Since several years, conventional wastewater treatment has been dealing with low volumetric loading rates and a high energy consumption (Van Haandel & Van der Lubbe, 2007; Pronk et al., 2017). Especially with the increasing standard of living and an increasing amount of households connected to a sewage system constant improvements are needed (Vlaamse milieumaatschappij, 2019a). The question arises how these challenges can be met in an efficient way. Over the past 20 years, aerobic granular sludge is presented as a promising technology to meet these challenges. Conventional activated sludge flocs, i.e. suspended microorganisms forming bulky aggregates, are converted into compact aerobic granules. This results in 25-75% less land area, 20-50% less energy and up to 7-17% less costs compared to conventional activated sludge plants (Pronk et al, 2017). The conventional use of aerobic granular sludge is in batch systems, but continuous systems are under research as well (Jahn et al., 2019).
The aim of this thesis is to gain further insight in continuous processes with aerobic granular sludge. Given that the current continuous systems are not depreciated, yet cannot meet the demand for higher treatment capacity, continuous aerobic granular sludge systems seem promising. Better settleability of granules could lead to higher biomass concentrations in the existing continuous systems, possibly resulting in a higher treatment capacity. Before researching how to get stable granules in a continuous flow reactor, it is needed to investigate the overall effect of granules on the performance of continuous reactors. In this thesis it is questioned if refurbishment of the current continuous activated sludge plants into continuous aerobic granular sludge plants would be advantageous in terms of treatment capacity and energy consumption, in order to meet the effluent criteria. This was investigated by developing the comparison between continuous systems with activated sludge and with aerobic granular sludge. The comparative study is obtained in different steps. In the literature review, a state-of-the-art on current wastewater treatment with activated sludge and aerobic granular sludge is given. Both the typical aerobic granular sludge implementation in batch systems and perspectives on aerobic granular sludge in continuous systems are discussed and compared based on literature findings. The chapter ‘Materials and methods’ describes the mathematical model based on the Benchmark Simulations Model No. 1 (BSM1) in Matlab-Simulink. A continuous activated sludge system serves as the reference model. Furthermore, this model is adapted to make it representable as a continuous
design with aerobic granular sludge based on two characteristics: better settleability and diffusion limitation.
In the chapter ‘Results and discussion’, the differences between both continuous systems are elucidated to answer the research question. Both the maximal treatment capacity and energy consumption in order to meet the effluent criteria were calculated and compared for both systems. Conclusions are summarized in the chapter ‘General conclusions’ and ‘Recommendations for further research’ are given.
Design Of Aerobic Granular Sludge Reactors
Introduction
Since several years, conventional wastewater treatment has been dealing with low volumetric loading rates and a high energy consumption (Van Haandel & Van der Lubbe, 2007; Pronk et al., 2017). Especially with the increasing standard of living and an increasing amount of households connected to a sewage system constant improvements are needed (Vlaamse milieumaatschappij, 2019a). The question arises how these challenges can be met in an efficient way. Over the past 20 years, aerobic granular sludge is presented as a promising technology to meet these challenges. Conventional activated sludge flocs, i.e. suspended microorganisms forming bulky aggregates, are converted into compact aerobic granules. This results in 25-75% less land area, 20-50% less energy and up to 7-17% less costs compared to conventional activated sludge plants (Pronk et al, 2017). The conventional use of aerobic granular sludge is in batch systems, but continuous systems are under research as well (Jahn et al., 2019).
The aim of this thesis is to gain further insight in continuous processes with aerobic granular sludge. Given that the current continuous systems are not depreciated, yet cannot meet the demand for higher treatment capacity, continuous aerobic granular sludge systems seem promising. Better settleability of granules could lead to higher biomass concentrations in the existing continuous systems, possibly resulting in a higher treatment capacity. Before researching how to get stable granules in a continuous flow reactor, it is needed to investigate the overall effect of granules on the performance of continuous reactors. In this thesis it is questioned if refurbishment of the current continuous activated sludge plants into continuous aerobic granular sludge plants would be advantageous in terms of treatment capacity and energy consumption, in order to meet the effluent criteria. This was investigated by developing the comparison between continuous systems with activated sludge and with aerobic granular sludge. The comparative study is obtained in different steps. In the literature review, a state-of-the-art on current wastewater treatment with activated sludge and aerobic granular sludge is given. Both the typical aerobic granular sludge implementation in batch systems and perspectives on aerobic granular sludge in continuous systems are discussed and compared based on literature findings. The chapter ‘Materials and methods’ describes the mathematical model based on the Benchmark Simulations Model No. 1 (BSM1) in Matlab-Simulink. A continuous activated sludge system serves as the reference model. Furthermore, this model is adapted to make it representable as a continuous
design with aerobic granular sludge based on two characteristics: better settleability and diffusion limitation.
In the chapter ‘Results and discussion’, the differences between both continuous systems are elucidated to answer the research question. Both the maximal treatment capacity and energy consumption in order to meet the effluent criteria were calculated and compared for both systems. Conclusions are summarized in the chapter ‘General conclusions’ and ‘Recommendations for further research’ are given.
Flexible Design and Operation of Multi-Stage Flash (MSF) Desalination Process Subject to Variable Fouling and Variable Freshwater Demand
Abstract:
This work describes how the design and operation parameters of the Multi-Stage Flash (MSF) desalination process are optimised when the process is subject to variation in seawater temperature, fouling and freshwater demand throughout the day. A simple polynomial based dynamic seawater temperature and variable freshwater demand correlations are developed based on actual data which are incorporated in the MSF mathematical model using gPROMS models builder 3.0.3. In addition, a fouling model based on stage temperature is considered. The fouling and the effect of noncondensable gases are incorporated into the calculation of overall heat transfer co-efficient for condensers. Finally, an optimisation problem is developed where the total daily operating cost of the MSF process is minimised by optimising the design (no of stages) and the operating (seawater rejected flowrate and brine recycle flowrate) parameters.
Flexible Design and Operation of Multi-Stage Flash (MSF) Desalination Process Subject to Variable Fouling and Variable Freshwater Demand
Abstract:
This work describes how the design and operation parameters of the Multi-Stage Flash (MSF) desalination process are optimised when the process is subject to variation in seawater temperature, fouling and freshwater demand throughout the day. A simple polynomial based dynamic seawater temperature and variable freshwater demand correlations are developed based on actual data which are incorporated in the MSF mathematical model using gPROMS models builder 3.0.3. In addition, a fouling model based on stage temperature is considered. The fouling and the effect of noncondensable gases are incorporated into the calculation of overall heat transfer co-efficient for condensers. Finally, an optimisation problem is developed where the total daily operating cost of the MSF process is minimised by optimising the design (no of stages) and the operating (seawater rejected flowrate and brine recycle flowrate) parameters.
Reviews
There are no reviews yet.