Water Softening Treatment Plant Study City of Grand Ledge

Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Share The Book

Executive Summary
The City of Grand Ledge (City) retained Fishbeck to evaluate options for the replacement of the City’s existing iron removal treatment system. Fishbeck is evaluating three options as part of this process: the installation of a new iron removal system, the installation of a new softening system, and receiving water from the adjacent Lansing Board of Water & Light (LBWL) system. This report evaluates the second option, the installation of a new softening treatment system to replace the existing iron removal system. The City’s existing iron removal plant utilizes an AERALATER® Type II-Q Packaged Iron and Manganese Removal System by General Filter (Aeralater) for iron removal. The Aeralater is at the end of its useful life, and has significant signs of deterioration. The repair of the Aeralater system was investigated as part of a prior study completed by Fishbeck, which determined that repair of the Aeralater would be costly and would give a low return on investment. The City opted to move forward assuming that the Aeralater unit would need to be
replaced, rather than attempt to repair it.

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

    0
    Your Cart
    Your cart is emptyReturn to Shop
    ×