Process | Metering
The main objective of metering is to measure and / or determine flowrates and / or quantities of hydrocarbon or non-hydrocarbon effluents present in oil installations. Operations and measurements that help determine the different components in the effluents measures are, by extension, part of the metering activity (sampling, on-site analysis…).
Process | Metering
The main objective of metering is to measure and / or determine flowrates and / or quantities of hydrocarbon or non-hydrocarbon effluents present in oil installations. Operations and measurements that help determine the different components in the effluents measures are, by extension, part of the metering activity (sampling, on-site analysis…).
P&ID’S Development Procedure
The purpose of this procedure is to define the methodology to be followed for the preparation of Piping and Instrumentation Diagrams drawings for the Bandar Abbas Gas Condensate Refinery Project. This document presents minimum requirement with respect to the preparation and presentation of the Piping and Instrument Diagrams (P&ID’s) for the detail design phase of Bandar Abbas Gas Condensate Refinery Project. These minimum requirements shall be applied but not limited to the Process Units, Utilities Units and Offsite Units P&ID’s, Utility Distribution P&ID’s and P&ID’s prepared by Vendors.
P&ID’S Development Procedure
The purpose of this procedure is to define the methodology to be followed for the preparation of Piping and Instrumentation Diagrams drawings for the Bandar Abbas Gas Condensate Refinery Project. This document presents minimum requirement with respect to the preparation and presentation of the Piping and Instrument Diagrams (P&ID’s) for the detail design phase of Bandar Abbas Gas Condensate Refinery Project. These minimum requirements shall be applied but not limited to the Process Units, Utilities Units and Offsite Units P&ID’s, Utility Distribution P&ID’s and P&ID’s prepared by Vendors.