“Programmable Logic Controller (PLC) : Programming & Applications”
“Programmable Logic Controller (PLC) Programming & Applications”
Source: https://www.puo.edu.my
Author: Norazila Binti Md Posdzi, Tan Ee Chin
Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Category:
Electrical & Automation
Only logged in customers who have purchased this product may leave a review.
Related products
SCADA Systems Hardware(And FirmWare)
. Introduction
This chapter introduces the fundamental concepts of DCS systems. The terms Supervisory Control and Data Acquisition (SCADA), Distributed Control System (DCS), Programmable Logic Controller (PLC), and Smart Instrument are defined and placed in the context used in this manual. The chapter is split into the following sections:
Definitions of the terms SCADA, DCS, PLC and smart instrument
Remote terminal unit (RTU) structure
PLCs used as RTUs
System reliability and availability
Communication architectures and philosophies
Typical considerations in configuration of a master station
SCADA Systems Hardware(And FirmWare)
. Introduction
This chapter introduces the fundamental concepts of DCS systems. The terms Supervisory Control and Data Acquisition (SCADA), Distributed Control System (DCS), Programmable Logic Controller (PLC), and Smart Instrument are defined and placed in the context used in this manual. The chapter is split into the following sections:
Definitions of the terms SCADA, DCS, PLC and smart instrument
Remote terminal unit (RTU) structure
PLCs used as RTUs
System reliability and availability
Communication architectures and philosophies
Typical considerations in configuration of a master station
Design Calculations for Electrical Design
Introduction:
Design calculations establish minimum guidelines and requirements for generating electrical calculations on projects. Electrical calculations should be made for all SPU projects that include electrical components and should be filed in the project notebook. Design calculations may be made either manually or by SPU-approved computer programs
Design Calculations for Electrical Design
Introduction:
Design calculations establish minimum guidelines and requirements for generating electrical calculations on projects. Electrical calculations should be made for all SPU projects that include electrical components and should be filed in the project notebook. Design calculations may be made either manually or by SPU-approved computer programs
Installation of Optical Fibre Cables Inside Sewer Ducts
Summary
ITU-T Recommendation L.77 describes methods to install optical cables inside sewer ducts, which applies to both the cable installation and the pre-installation of an infrastructure, if requested. This Recommendation covers both man- and non-man-accessible sewer ducts. This Recommendation is not intended to address all of the safety concerns, if any, associated with its use. Therefore, it shall be the responsibility of the user of this Recommendation to establish appropriate health and safety practices and determine the applicability of regulatory limitations, if any, prior to its use.
Installation of Optical Fibre Cables Inside Sewer Ducts
Summary
ITU-T Recommendation L.77 describes methods to install optical cables inside sewer ducts, which applies to both the cable installation and the pre-installation of an infrastructure, if requested. This Recommendation covers both man- and non-man-accessible sewer ducts. This Recommendation is not intended to address all of the safety concerns, if any, associated with its use. Therefore, it shall be the responsibility of the user of this Recommendation to establish appropriate health and safety practices and determine the applicability of regulatory limitations, if any, prior to its use.
Process Automation In Wastewater Treatment Plants: the Finnish Experience
Abstract:
The degree and importance of automation at municipal wastewater treatment plants (WWTPs) have increased with the development of technology and tightening of treatment requirements. The objective of this paper is to assess and document the current status of process automation at WWTPs in Finland to determine successful practices and the needs of plant operators. Renewing ammonia or organic content
removal processes to total nitrogen removal processes has also increased the need of Instrumentation, Control and Automation (ICA). The survey has quantified that the reliability and accuracy of the on-line sensor measurement has improved recently, which makes the use of on-line measurements in control more applicable. The use of nutrient sensors in control is apparently still rare at Finnish WWTPs even though their use for monitoring purposes is common.
Process Automation In Wastewater Treatment Plants: the Finnish Experience
Abstract:
The degree and importance of automation at municipal wastewater treatment plants (WWTPs) have increased with the development of technology and tightening of treatment requirements. The objective of this paper is to assess and document the current status of process automation at WWTPs in Finland to determine successful practices and the needs of plant operators. Renewing ammonia or organic content
removal processes to total nitrogen removal processes has also increased the need of Instrumentation, Control and Automation (ICA). The survey has quantified that the reliability and accuracy of the on-line sensor measurement has improved recently, which makes the use of on-line measurements in control more applicable. The use of nutrient sensors in control is apparently still rare at Finnish WWTPs even though their use for monitoring purposes is common.
Electrical Advanced-Level Training
Introduction:
This training is recommended for inspectors performing component design bases inspections (CDBIs) or other detailed inspections of electrical systems. Inspectors with demonstrated experience may be grandfathered in the completion of this training, if approved by the division director.
Completion of technical proficiency-level training (Appendix C in IMC 1245) is strongly recommended before beginning this training. You may complete the requirements in this training standard along with the general proficiency requirements contained in Appendix B and
the technical proficiency requirements in Appendix C.
Objectives of Advanced-Level Training This training focuses on the activities necessary to fully develop individuals as lead or “experts” in the electrical inspection area. It is not the intent that all certified inspectors will complete all of the ISAs in this advanced appendix. In addition, this appendix should also be viewed as an inspector’s aid and could be used during an inspection to assist in inspecting a particular area.
Electrical Advanced-Level Training
Introduction:
This training is recommended for inspectors performing component design bases inspections (CDBIs) or other detailed inspections of electrical systems. Inspectors with demonstrated experience may be grandfathered in the completion of this training, if approved by the division director.
Completion of technical proficiency-level training (Appendix C in IMC 1245) is strongly recommended before beginning this training. You may complete the requirements in this training standard along with the general proficiency requirements contained in Appendix B and
the technical proficiency requirements in Appendix C.
Objectives of Advanced-Level Training This training focuses on the activities necessary to fully develop individuals as lead or “experts” in the electrical inspection area. It is not the intent that all certified inspectors will complete all of the ISAs in this advanced appendix. In addition, this appendix should also be viewed as an inspector’s aid and could be used during an inspection to assist in inspecting a particular area.
Reviews
There are no reviews yet.