Coos Bay Wastewater Treatment Plant #2 Preliminary Design


Usually dispatched in 2 to 3 days
Usually dispatched in 2 to 3 days
Share The Book

The purpose of this technical memorandum (TM) is to provide the City of Coos Bay an overview of the predesign report and a summary of some of its content. The predesign engineering for this project includes the design development of the City’s new wastewater treatment plant adjacent to the existing Wastewater Treatment Plant 2. The new plant will consist of an influent pump station, headworks screening and grit removal facility, sequencing batch reactor activated sludge process and ultraviolet disinfection prior to discharging to Coos Bay through an existing outfall pipe and diffuser. 

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

    0
    Your Cart
    Your cart is emptyReturn to Shop
    ×